Who Sets Trade Show Labor Rules
Exhibitors ask the same questions every year: can I set up my own booth, can I bring a cart, why do I need to pay someone to plug in a light? The honest answer is that it depends on the venue. As the show manager, you don't set labor jurisdiction, but you are the one who has to explain it in the exhibitor manual and enforce it on the floor.
- Who sets the rules: the venue, the general service contractor (GSC) and the local collective bargaining agreements they work under
- Where union jurisdiction is common: many large convention centers, especially in major cities, and some hotel ballrooms and civic centers
- Where it is less common: many smaller venues, fairgrounds, expo halls and hotels, though some still have exclusive contractors for certain work
- What doesn't change it: the organizer's preferences, the exhibitor's home state or what another venue allowed last year
Typical Labor Jurisdiction Categories
Most labor rules divide the work into categories, each handled by a specific trade or contractor. The table below shows the categories organizers usually need to explain. Who does each one at your venue is for the venue and GSC to confirm.
| Category | What it covers | Usually handled by | What exhibitors often need to know |
|---|---|---|---|
| Material handling (drayage) | Unloading freight at the dock, delivering it to the booth, storing empties, reloading at move-out | The GSC's freight crew | Freight, pallets and anything moved with equipment go through the GSC |
| Installation and dismantle (I&D) | Assembling and taking down booth structures, walls, counters and graphics | Show labor ordered from the GSC, or an approved EAC | Small displays may be exempt; built exhibits usually aren't |
| Electrical | Power to the booth, distribution inside it, lighting connections | The venue's or show's official electrical contractor | Exhibitors can often plug in their own equipment, but not run distribution |
| Rigging | Hanging signs, truss and anything lifted overhead | The official rigging contractor | Order and submit drawings by the deadline |
| Carpentry and decorating | Carpet, flooring, drape, custom construction on site | The GSC | Carpet laying and on-site building are often show labor |
| Plumbing, utilities and cleaning | Water, drains, compressed air, booth cleaning | The venue or its exclusive contractors | Usually ordered, not done by exhibitors |
Freight is the category exhibitors hit first. Link the trade show material handling guide for how drayage is billed, and point exhibitors to the drayage calculator so they can estimate costs before they ship. Exhibitors who hire their own installer follow the exhibitor appointed contractor rules for notification and insurance.
What Exhibitors Can Usually Do Themselves
Exhibitors save money and stress when they know exactly what they may do themselves. The examples below are common, not universal: replace them with your venue's actual rules.
| Task | Often allowed? | Common conditions |
|---|---|---|
| Hand-carry items into the hall | Often | One trip, no carts or dollies, through a designated door, sometimes a size or weight limit |
| Set up a tabletop or pop-up display | Often | Full-time employees only, hand tools only, within a time limit such as 30 minutes |
| Unpack and place products and literature | Usually | After the booth structure is in place |
| Plug in equipment to power supplied to the booth | Often | Distribution and lighting connections may need the electrical contractor |
| Use power tools or ladders | Rarely | Usually show labor or an approved EAC |
| Assemble a large or custom exhibit | Rarely | Show labor or an approved EAC, with supervision options |
| Move freight with a pallet jack or forklift | No | Material handling by the GSC |
| Hang signs or anything overhead | No | Official rigging contractor |
Straight Time vs Overtime: Scheduling Move-In
Overtime is where labor bills surprise exhibitors. Straight time covers standard weekday hours; overtime, and sometimes double time, covers early mornings, evenings, weekends and holidays. Exact hours and rates are in the GSC's service kit. Your move-in schedule decides how much of the build falls into overtime.
- 1
1. Get the straight time hours
Ask the GSC for the straight time window at your venue on each move-in and move-out day, and build the schedule around it.
- 2
2. Move in large exhibits first
Give islands and large exhibits the earliest straight time slots, since they need the most labor hours. Inline and tabletop booths can follow.
- 3
3. Set targeted move-in windows
Assign target move-in times by booth area or size, so freight and labor are spread across the day instead of piling up at the doors.
- 4
4. Flag unavoidable overtime early
If a weekend or holiday move-in can't be avoided, tell exhibitors when they book, not in the final manual, so they can budget.
- 5
5. Push early labor orders
Remind exhibitors to order labor before the service kit's discount deadline and to book a start time inside straight time hours.
Publish the times in an exhibitor move-in schedule, with target windows by booth area, and repeat the straight time hours beside it.
Copy-Ready Labor Rules for the Exhibitor Manual
Paste this into the exhibitor manual template and fill in the brackets from the venue's and GSC's written rules. It is a starting point, not legal advice, and it must match what the venue and contractors tell you for your dates.
- Keep the venue and contractor names in the clause, so exhibitors know who to call
- State the self-setup time limit and booth size exactly; vague wording causes arguments on the floor
- Link the service kit rather than pasting rates that may change
- Cross-reference the EAC deadline so exhibitors who hire installers file on time
How to Communicate Labor Rules to Exhibitors
- 1
At booking
Add one sentence to the prospectus and exhibitor agreement: labor at this venue follows the venue's and GSC's rules, summarized in the exhibitor manual. Exhibitors with big builds need to know before they sign.
- 2
When the manual opens
Publish the full labor rules section and the service kit in the exhibitor portal when the manual opens, with the discount and EAC deadlines on the onboarding checklist.
- 3
Before move-in
Send a short email four to six weeks out with the self-setup rule, the hand-carry rule, the straight time hours and the exhibitor's move-in time.
- 4
On site
Brief floor managers on the rules and the GSC contact, and post the hand-carry and self-setup rules at the exhibitor entrance.
Keep the rules, service kit, EAC forms and move-in times together in an exhibitor portal, and see trade show management software for the system behind the floor plan, sales and exhibitor services.