Skip to main content
Show Logistics

Trade Show Material Handling: What Drayage Is, How It's Billed and a Shipping Notice

An organizer's explanation of trade show material handling for exhibitors: what drayage covers, how CWT billing and surcharges typically work, advance warehouse vs direct to show, and a copy-ready shipping notice.

What Trade Show Material Handling (Drayage) Is

First-time exhibitors are often surprised by a material handling invoice larger than their freight bill. The fix is to explain it before they ship: what it is, how it's calculated and what they can do to keep it down. You don't need to quote rates yourself; point to the service kit from your general service contractor (GSC), which has the real numbers.

What material handling covers and what it doesn't
Covered by material handlingNot covered
Receiving freight at the advance warehouse or the dockThe carrier's charge to get freight to the warehouse or venue
Delivering freight to the boothInstalling or building the booth (labor is ordered separately)
Removing, storing and returning empty crates and casesFurniture, carpet, electrical and other rentals
Moving freight back to the dock for outbound carriersOutbound shipping charges after the carrier picks up
What material handling covers and what it doesn't

How Material Handling Is Billed (CWT and Surcharges)

Every contractor's service kit is different, but most material handling charges are built from the same parts. The table below describes typical practice; it doesn't quote any rate.

How material handling is typically billed
Charge elementHow it usually worksWhat exhibitors should know
Rate per CWTCharged per 100 pounds, weight rounded up to the next 100Weight comes from the certified weight ticket or the contractor's scale
Minimum chargeA minimum weight or fee per shipmentSeveral small boxes sent separately can each hit the minimum
Crated vs uncratedCrated or skidded freight costs less to handle than loose cartons or blanket-wrapped itemsPack in crates, cases or on skids where possible
Special handlingA higher rate for freight that needs extra labor, such as ground loads, stacked or constricted deliveriesAsk the carrier to load freight so it can be unloaded easily
Overtime surchargeA percentage added for freight handled outside regular hoursArrive within the target window and regular hours
Late arrival surchargeAdded when freight arrives after the warehouse deadline or the move-in windowShip by the published deadlines
Small package or hand-carrySeparate rules for small parcels; hand-carry may be allowed without chargeCheck the venue's hand-carry rule before relying on it
How material handling is typically billed

As a worked example with made-up numbers: if a service kit listed $[RATE] per CWT for crated freight, a 1,250-pound crate would be billed as 13 CWT, or 13 x $[RATE], plus any surcharge that applies. The same weight in loose cartons could fall in a higher category. Ask exhibitors to read the actual rates in the service kit before booking freight.

Advance Warehouse vs Direct to Show

Advance warehouse vs direct to show
FactorAdvance warehouseDirect to show
When freight arrivesDays or weeks before the show, by a set deadlineOn move-in day, within the exhibitor's target window
Delivery to the boothTypically delivered early in move-inDelivered when the truck is unloaded from the dock
Risk of delayLower: freight is already onsiteHigher: traffic, carrier delays or a missed yard cutoff
Marshalling yardNot needed for this freightTruck checks in at the yard and waits for dispatch
Handling chargesMaterial handling applies; late arrival adds a surchargeMaterial handling applies; overtime may apply outside regular hours
Best forCrated exhibits, international freight, exhibitors flying inExhibitors with their own truck or a dedicated carrier
Advance warehouse vs direct to show

Direct to show trucks run through the marshalling yard; the trade show marshalling yard guide explains check-in and dispatch. The trade show logistics guide puts shipping, move-in and outbound freight on one timeline, and the exhibitor move-in schedule gives a template for target windows.

Copy-Ready Shipping Notice for Exhibitors

How Exhibitors Can Keep Material Handling Down

  • Ship fewer, larger pieces: consolidate cartons onto skids or into crates
  • Use the advance warehouse by its deadline to avoid late surcharges
  • Arrive within your target window and regular hours to avoid overtime
  • Get the weight right on the bill of lading and keep the weight ticket
  • Hand-carry small items where the venue allows it
  • Order material handling in advance if the service kit offers a discount for it
  • Keep empty crate labels from the service desk so empties come back to the right booth

Ask your GSC for the material handling section of the service kit early, and ask how they handle disputes over weight or category; the questions to ask a general service contractor list includes the freight questions. On larger shows, trade show management software keeps the shipping notice, the service kit and each exhibitor's booth number together, so labels and messages carry the right details.

How Map D Helps

Put Shipping Rules Next to Each Exhibitor's Booth

Map D doesn't move freight or bill drayage; your general service contractor does. It gives your shipping notice, service kit and labels a place in every exhibitor's portal, ties each message to the exhibitor's booth number, and shows who hasn't confirmed their shipping plan. You can build the floor plan for one event free; publishing, sharing the map and selling booths need a paid plan (from $1,500 per event).

  • A Documents page for the shipping notice, service kit and labels, shown in each exhibitor's portal, on order pages and in confirmation emails
  • Onboarding tasks with due dates, such as confirming advance or direct shipping, with your approval if needed
  • Email Center messages with each exhibitor's booth filled in through {{Booth}}, so shipping labels carry the right booth number
  • Booth numbers on the published floor plan, searchable by exhibitor name or booth number
  • High-resolution PNG export of the floor plan for the contractor, dock team and marshalling yard
See it on your own floor plan

Stop reading about it. Build one.

Upload the floor plan you already have and place your booths on it yourself, in Map D’s editor. Free to build, no contract, and nothing to install.

900+
Organizers who have run shows on Map D
9,000+
Events powered since 2011
1.8M+
Booths drawn to date

“I am really excited about this. The staff met with me this morning and we all LOVE the platform. People are already filling out their booths.”

· Director, International Trade and Development @ Maine Insurance Agents Association
FAQ

Questions Organizers Ask

What is drayage at a trade show?

Drayage is another name for material handling at a trade show: moving an exhibitor's shipment from the dock or advance warehouse to the booth, handling empty crates during the show and moving it back to the dock at move-out. It is separate from the freight cost the exhibitor pays a carrier to get the shipment to the show.

What does CWT mean in material handling?

CWT means hundredweight, or 100 pounds. Material handling rates are commonly quoted per CWT, so a 1,250-pound shipment is 13 CWT after rounding up. Most contractors also have a minimum charge per shipment and round weights up to the next 100 pounds. Your contractor's service kit has the actual rates and rules.

Do exhibitors have to pay material handling?

Typically, yes. Venues and contractors often make material handling an exclusive service, so it applies whether freight goes to the advance warehouse or direct to show. Exhibitors who hand-carry small items through a set entrance, without carts, often avoid it. Check your venue and contractor rules before you promise anything.

How can exhibitors reduce drayage charges?

Ship fewer, consolidated pieces on skids, crate or palletize instead of sending loose cartons, use the advance warehouse by its deadline, hit the target move-in window, avoid overtime, and hand-carry small items where the venue allows it.

Advance warehouse or direct to show: which is better?

The advance warehouse receives freight before the show and the contractor delivers it to the booth at the start of move-in. Direct to show freight arrives on move-in day through the marshalling yard. Advance shipping gives more certainty about delivery time; direct shipping can suit exhibitors with their own truck or a dedicated carrier.